Coiled Tubing Operations

0

Coiled Tubing Operations

1 / 30

A CT cleanout is being undertaken. the well is live throughout the job and returns are being taken through an adjustable choke. Where is the correct location for this choke?

2 / 30

What is the primary barrier element when installing coiled tubing tools in the riser?

3 / 30

Which barrier element are the dual flapper valves in a coiled tubing string?

4 / 30

Which kind of barrier element is a shear/seal BOP (safety head)?

5 / 30

When rigged up on a live well as in the picture below, can the pipe rams be redressed with coil in the hole?

6 / 30

Given the drawing below, match it to the correct description.

7 / 30

Given the drawing below, match it to the correct description.

8 / 30

Given the drawing below, match it to the correct description.

9 / 30

Of the these common types of stripper, which has the packer replaced through the top of the stripper?

10 / 30

Which stripper type allows change out of the sealing rubber without pulling the coiled tubing out of the well?

 

11 / 30

Which of the following rams would normally be closed so that a worn stripper element can be changed out with pipe in the hole?

12 / 30

What determines the maximum rated working pressure of a stripper?

13 / 30

Which of the following rams would normally be closed so that a worn stripper element can be changed out with pipe in the hole?

14 / 30

What happens when the stripper is energised (packed)?

 

15 / 30

The stripper is packed. If the wellhead pressure increases, does it assist the assembly to pack the stripper?

 

16 / 30

Which ram has no sealing function?

17 / 30

Which ram has no sealing function?

 

18 / 30

Why is a shear/seal BOP (safety head) installed?

19 / 30

Which of the following pressure control equipment items must be changed if the Coiled Tubing size is changed?

20 / 30

Which of the following pressure control equipment items must be changed if the Coiled Tubing size is changed?

21 / 30

Which of the following pressure control equipment items must be changed if the Coiled Tubing size is changed?

22 / 30

A ball has been dropped to open a circulating sub above the check valves and reverse cir- culation has been carried out. The well remains live. Which of the following statements is true?

23 / 30

Which of the following statements is the best description of a CT deployment system?

24 / 30

CT has been rigged up on a live well as in the drawing below. Lines from the pump are connected to the kill wing, the quad and the reel.

The blind rams and the safety head must be tested from the correct direction. Through which connection should the tests be done?

25 / 30

With coil in the hole, it is noticed that the connection between the quad and the stripper is leaking. Which secondary barrier element must be closed to allow the leak to be repaired?

26 / 30

While pulling out of the hole, a pinhole in the coiled tubing is noticed as the pipe is coming out of the injector head. What is the most likely correct first course of action to take in this situation?

27 / 30

Which of the following may be indications that the CT string has parted?

28 / 30

Which of the following may be indications that the CT string has parted?

29 / 30

When rigging up coiled tubing on the well, which of the following statements are true?

30 / 30

When rigging up coiled tubing on the well, which of the following statements are true?