1 / 10

While Pulling Out of the Hole (POOH), a kick is taken and the well is shut-in. Use the information below to answer the following question:

Bit is 1500 ft off bottom
SICP = 250 psi
Estimated swabbed-in volume = 15 bbls
Casing capacity = 0.0505 bbl/ft

If the kick is below the bit, what would be the SIDPP with no float in the drill string?

2 / 10

While stripping back to bottom to circulate a swabbed-in kick, what would happen to the casing pressure as the drill string is stripped into the influx?

3 / 10

A kick is swabbed-in while pulling out of the hole (POOH) and the annular is closed. A full opening safety valve (FOSV) is stabbed and closed. There is no float in the drill string and the decision to strip back to bottom was made. What is the next action before the stripping operation takes place?

4 / 10

Gas kick was taken 20 stands off bottom. While preparing to strip to bottom, surface pressures have been increasing.
If the casing pressure is held constant while stripping to bottom, what is the volume recovered in the trip tank due to?

5 / 10

The well is shut-in after a kick is swabbed-in while tripping out. If the bit is above the kick and casing pressure is 150 psi, what would be the SIDPP if there is no float in the drill string?

6 / 10

What is the proper procedure to maintain the Bottom Hole Pressure (BHP) constant while stripping pipe into the well if the gas is not migrating?

7 / 10

While Pulling Out of the Hole (POOH), a kick is taken and the well is shut-in. Use the information below to answer the following question:
Bit is 2000 ft off bottom
SICP = 150 psi
Estimated swabbed-in volume = 10 bbls
Casing capacity = 0.0505 bbl/ft

If the bit is above the kick, what would be the SIDPP with no float in the drill string?

8 / 10

If the well is shut-in while tripping out of the hole, what would indicate that the kick is below the bit?

9 / 10

Consider the plan below to answer the following question.
A kick was swabbed-in while pulling out of the hole.
The decision made is to strip back to boottom using the barrel-in/barrel out technique.
While preparing to start the stripping operation, casing pressure increased indicating that the gas is migrating.
What is the risk in using the barrel-in/barrel-out technique to strip if the gas kick is migrating?

10 / 10

A kick has been swabbed-in and the well has been shut-in with the bit 1500 ft off bottom. Which of the options below is the best course of action to take?