While Pulling Out of the Hole (POOH), a kick is taken and the well is shut-in. Use the information below to answer the following question:
Bit is 1500 ft off bottom
SICP = 250 psi
Estimated swabbed-in volume = 15 bbls
Casing capacity = 0.0505 bbl/ft
If the kick is below the bit, what would be the SIDPP with no float in the drill string?